Irreversible investments with delayed reaction: an application to generation re-dispatch in power system operation
In this article we consider how the operator of an electric power system should activate bids on the regulating power market in order to minimize the expected operation cost. Important characteristics of the problem are reaction times of actors on the regulating market and ramp-rates for production changes in power plants. Neglecting these will in general lead to major underestimation of the opera
