Optimal harmonic period assignment : complexity results and approximation algorithms
Harmonic periods have wide applicability in industrial real-time systems. Rate monotonic (RM) is able to schedule task sets with harmonic periods up to 100% utilization. Also, if there is no release jitter and execution time variation, RM and EDF generate the same schedule for each instance of a task. As a result, all instances of a task are interfered by the same amount of workload. This property